Duane Morris·ENERGY-RENEWABLES
FERC approves novel JTIQ transmission interconnection reform
FERC has approved a MISO-SPP joint proposal allowing upfront portfolio transmission upgrades to interconnect 28-53 GW of new generation, potentially reshaping how renewable energy projects navigate lengthy interconnection queues.
ferc-approvaltransmission-interconnectionmiso-sppjtiq-queue-reformenergy-infrastructurerenewable-generation
Read the original firm alert →Thursday, August 6, 2026